Hermes Business Campus - Building C

Bucharest, District 2, 5-7 Dimitrie Pompeiu blvd

Building description

Hermes Business Campus (HBC) will be a newly developed project to be developed in phases with the 1st Phase comprising a total rentable area of 18,225 sq m which is arranged on Ground and 8 upper levels. The average floor plates offer approximately 2,000 sq m on a single level arranged in a ‘U’ shape with high modularity which delivers highly efficient, open plan space with the flexibility to split and space plan as necessary. The façade and floor layouts mean that natural light penetration to all areas of the floor is good and therefore a quality work environment is available to the employees working the building. A number of modern and innovative installations and equipments will be used in the building including active ceilings, rasied floors, opening windows and module façade to allow for re-positioning of window sections where space planning requires it. The building will also target a high level of BREEAM accreditation which should also deliver lower operating costs to Tenants. The car parking for the project will be located in the basement levels. A canteen facility for tenants will be located on ground floor of the property as well as some other amenities and services which will be readily accessible for tenants. Further amenities and services are available in the immediate area as part of neighbouring business parks and within easy walking distance.

Show on map

Hermes Business Campus is located in the Pipera City submarket, on Dimitrie Pompei Blvd. The business park has an easy access to Pipera Metro Station (M2), the main North to South Metro connection. The subject Metro line ensures the easy flow of the employees from southern high dense residential areas towards northern business locations of the city. In addition tram lines and shuttle buses ensure the access of the employees to all business parks recently developed in the Pipera City area. The international airports (Baneasa, Henri Coanda/Otopeni) are at 20-30 minutes driving distance but the recently delivered infrastructures works improved the traffic flow in and out of Pipera City.

Commercial terms

Building information

  • Building status Existing
  • Total building space 24 000 m²
  • Parking ratio To be agreed
  • Green building certification BREEAM - excelent
  • Building completion date IV quarter 2016
  • Total net rentable office space in building 21 908 m²
  • Number of parkings -

Amenities

  • ATM
  • Bank
  • Canteen
  • Fitness Club
  • Medical Center
  • Parking for guests
  • Pharmacy

Standard fit-out

  • Air conditioningAir conditioning
  • Raised floorRaised floor
  • Suspended ceilingSuspended ceiling
  • Telephone cablingTelephone cabling
  • Power cablingPower cabling
  • Smoke detectorsSmoke detectors
  • CarpetingCarpeting
  • ReceptionReception
  • SecuritySecurity
  • Fibre opticsFibre optics
  • SwitchboardSwitchboard
  • Openable windowsOpenable windows

Are you interested in this offer?

Call us and find out more

You can leave your phone number and we will contact you

Similar offices

Contact form

Fill the form

*
*
*
*